0

Out of 0 Ratings

Owner's of the Cisco Systems Boat Cisco Systems Boat gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 128
 
2-7
Cisco Catalyst 4900M Switch Installation Guid e
78-18350-02
Chapter 2 Site Planning
Grounding Requirements
Figure 2-9 CAB-BS1363-C15-UK=, CAB-7KACU= (United Kingdom)
Grounding Requirements
Grounding is recommended on all AC-input or DC-input installations, using only approved copper
connectors. Attach the provided two hole ground lug to the chassis using M4 x 8mm bolts and then to
the central office (CO) or other interior ground system with number 6 AWG wire. The grounding pad is
located on the rear of the chassis, as shown in Figure 2-10.
Figure 2-10 Grounding Pad Location
Safety Overview
This section provides safety information that you should read and understand to ensure a safe switch
installation.
Ensuring Safety
Follow these guidelines to ensure your safety and protect the equipment. This list is n ot inclusive of all
potentially h azardous situation s that you may be exposed to as you install the switch, so be alert.
Cordset rating: 10 A, 250 V
Length: 8 ft 2 in. (2.5 m)
113351
Connector: IEC 60320 C15
Plug: BS 1363
13A
fuse
1 Grounding pad
1
232131