CHAPTER
3-1
Cisco Catalyst 4900M Switch Installation Guid e
78-18350-02
3
Installing the Switch
Revised: January 4, 2012
This chapter describes how to install the Catalyst 4900M switch. For first-time installations, perform the
procedures in the following sections in the order listed.
Checking th e Contents, page 3-1
Rack-Mounting the Switch, page 3-2
Connecting Power to the Catalyst 4900M Switch, page 3-7
Connecting DC-Input Power to the Catalyst 4900M Switch, page 3-9
Optical Con nections, page 3-14
Configurable Modules, page 3-14
Note Before starting the installation procedures in this chapter, complete the site planning checklist in
Chapter 2, “Site Planning,” to verify that all planning activities were completed.
Checking the Contents
Note Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and sto re
them. You will need the container if you need to move or ship the switch in the future.
To check the contents of the shipping container follow these steps:
Step 1 Check the contents of the accessories kit against the packing slip. Verify that you received all listed
equipment, which should include the following:
Switch hardware and software documentation, if ordered
Optional equipment that you ordered, such as network interface cables, transceivers, or special
connectors. A console cable is not provided as part of th e accessory kit. It can ordered as an option.
Step 2 To begin installation, proceed to the “Rack-Mounting the Switch” section on page 3-2.