0

Out of 0 Ratings

Owner's of the Cisco Systems Boat Cisco Systems Boat gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 128
 
3-18
Cisco Catalyst 4900M Switch Installation Guide
78 -18 35 0- 0 2
Chapte r 3 Installing the Switch
Configurable Modules
Figure 3-11 Installing the Switching Module in the Chassis
Step 7 Carefully slide the switching module into the slot until both ejector levers engage the chassis sides
equally and the module is seated in the backplane.
Step 8 Use a screwdriver to tighten the captive installation screws on each end of the switching module
faceplate.
To check the status of the module, perform the following steps:
Step 1 Ensure that the STATUS LED is green (module operational).
Step 2 When the switch is online, enter the show module command. Verify that the system acknowledges the
new module and that the module’s status is listed as good in the command output.
Step 3 If the module is not operational, reseat it. If the module is still not operational, contact your customer
service representative.
1 Captive screw
232516
1
1